Skip to main content
Demo Imagery

Basement Development — St. Vital

Basement plumbing for a full development including a bathroom, wet bar, and laundry area.

Basement bathroom rough-in before finishing
Finished basement bathroom with modern fixtures

Project scope

The unfinished basement needed complete plumbing rough-in for a new bathroom, wet bar, and laundry connections.

Work completed:

  • Bathroom rough-in (toilet, shower, vanity)
  • Wet bar supply and drain
  • Laundry connections
  • Sump pump installation
  • Floor drain configuration

Approach

Because the basement was below the main sewer line, we installed an ejector pump system for the bathroom fixtures. All rough-in was completed before framing, with fixture installation after finishes.

Installed components:

  • Sewage ejector pump system
  • Bathroom fixture rough-in
  • Wet bar connections
  • Laundry supply and drain
  • Sump pump with battery backup

Need similar work?

Contact us to discuss your plumbing project. We provide professional assessments and written estimates.

Need plumbing service?

Contact us for a professional assessment. We serve Winnipeg and surrounding communities.

Call NowRequest Service